research-document
Communication Engineering portfolio roadmap
Communication Engineering portfolio roadmap
Portfolio version: 0.2.0
Updated: 2026-07-30
Authority: mutable frontier view governed by DF-COMM-2026-0001
Program objective: develop and validate a context-sensitive framework that
helps humans and AI choose communication strategies for specified audiences,
objectives, and constraints.
Portfolio thesis
The program should advance from measurable, low-risk communication tasks toward broader explanatory and selection models. It must not begin with an exhaustive style catalog or AI optimizer: both depend on validated constructs, outcomes, and boundary conditions.
Prioritization method
Priority is a judgment based on five 0–3 factors:
- decision leverage;
- uncertainty reduction;
- dependency unlock;
- feasibility;
- risk reduction.
Scores support review but do not replace reasoning. Safety, ethics, missing authority, or decisive evidence can override a total. Ties favor work that creates discriminating evidence and reusable measurement infrastructure.
Current portfolio graph
flowchart TD
RQ001["RQ-COMM-001<br/>Select pilot task and audience"]
RQ003["RQ-COMM-003<br/>Define outcome measures"]
RQ004["RQ-COMM-004<br/>Define constraints"]
RQ006["RQ-COMM-006<br/>Run feasibility pilot"]
RQ007["RQ-COMM-007<br/>Run controlled comparison"]
RQ008["RQ-COMM-008<br/>Build functional taxonomy"]
RQ009["RQ-COMM-009<br/>Design AI selection model"]
RQ010["RQ-COMM-010<br/>Validate across contexts"]
RQ001 --> RQ003
RQ004 --> RQ001
RQ001 --> RQ006
RQ003 --> RQ006
RQ004 --> RQ006
RQ006 --> RQ007
RQ007 --> RQ008
RQ008 --> RQ009
RQ007 --> RQ010
RQ010 --> RQ009
Portfolio items
RQ-COMM-001 — Select a concrete pilot task and audience
- Parent: program objective
- Children: RQ-COMM-006
- Maturity: Scoping
- Priority: P0; score 13/15 (leverage 3, uncertainty 3, unlock 3, feasibility 2, risk reduction 2)
- Supporting evidence: EV-COMM-2026-0001 through 0003; HY-COMM-2026-0001
- Contradicting evidence: none direct
- Dependencies: RQ-COMM-003, RQ-COMM-004
- Related research: RQ-COMM-005, RQ-COMM-011
- Produced artifacts: RP-COMM-2026-0001; MS-COMM-2026-0001
- Engineering enabled: experimental harness and reusable task fixtures
- Confidence: Medium that procedural documentation is the right class; Low for any specific task
- Largest uncertainty: stakeholder value and representative recruitment
- Next action: interview or otherwise obtain evidence from at least one intended user group; compare three task candidates against a frozen rubric
- Exit evidence: named audience, observed need, safe synthetic task, measurable success/failure, feasible recruitment, and no floor/ceiling result
- Review trigger: task candidate requires sensitive data or specialist harm review
RQ-COMM-002 — Test the disciplinary boundary
- Parent: program objective
- Children: RQ-COMM-008
- Maturity: Idea
- Priority: P2; score 8/15
- Supporting evidence: none
- Contradicting evidence: repository charter warns against assuming a new discipline
- Dependencies: two completed empirical cycles
- Related research: communication theory, HCI, rhetoric, information architecture, technical communication, systems engineering
- Produced artifacts: none
- Engineering enabled: vocabulary and repository/product boundary decisions
- Confidence: Low
- Largest uncertainty: whether the proposed field adds predictive or operational value beyond integration of existing fields
- Next action: defer comparative review until the program has concrete constructs and outcomes
- Exit evidence: explicit comparison of scope, mechanisms, methods, predictions, and incremental utility
- Review trigger: any external-facing discipline claim
RQ-COMM-003 — Define a purpose-to-outcome measurement model
- Parent: program objective
- Children: RQ-COMM-001, RQ-COMM-006, RQ-COMM-007
- Maturity: Deep Investigation
- Priority: P0; score 14/15
- Supporting evidence: EV-COMM-2026-0001 through 0005 and 0007 through 0010; HY-COMM-2026-0003
- Contradicting evidence: EV-COMM-2026-0004 and 0009 show metric divergence; EV-COMM-2026-0007 contradicts universal use of time
- Dependencies: none for scoping; task selection for validation
- Related research: psychometrics, usability, learning science, decision science
- Produced artifacts: preliminary matrix below; RP-COMM-2026-0001 and 0002; active mission MS-COMM-2026-0002
- Engineering enabled: scoring rubric, instrumentation, acceptance tests
- Confidence: Medium
- Largest uncertainty: task-specific reliability, sensitivity, burden, and accessibility feasibility
- Next action: apply the RP-COMM-2026-0002 scoring specification to three RQ-COMM-001 candidate tasks, then run an independent-rater and floor/ceiling feasibility check
- Exit evidence: reliability, validity, sensitivity, burden, and failure-mode assessment for each selected measure
- Review trigger: primary outcome chosen or pilot produces metric conflict
Preliminary outcome architecture:
| Communication purpose | Primary candidate outcome | Guardrails | Common invalid proxy |
|---|---|---|---|
| Inform | accurate comprehension | calibration, accessibility | reading level |
| Instruct | unassisted correct task completion | critical errors, assistance, accessibility | preference or speed alone |
| Teach | delayed transfer to a new problem | misconceptions, effort | immediate recall |
| Support a decision | decision quality relative to stated values/evidence | uncertainty understanding, harm | conversion |
| Persuade ethically | informed, autonomous attitude/action change | truth, coercion, subgroup harm | engagement |
| Coordinate | shared state and correct next actions | latency, repair cost | message count |
| Build warranted trust | trust calibration to actual reliability | skepticism, correction response | trust score alone |
RQ-COMM-004 — Establish ethical, privacy, safety, and accessibility constraints
- Parent: program objective
- Children: RQ-COMM-001, RQ-COMM-006, RQ-COMM-009
- Maturity: Scoping
- Priority: P0; score 13/15
- Supporting evidence: EV-COMM-2026-0006; GV-ENG-001
- Contradicting evidence: none
- Dependencies: task/data-flow detail for validation
- Related research: RQ-COMM-012
- Produced artifacts: synthetic-data constraint in MS-COMM-2026-0001
- Engineering enabled: recruitment/data plan, accessibility acceptance criteria, safe optimization boundaries
- Confidence: Medium
- Largest uncertainty: participant-data classification and applicable review
- Next action: write a task-specific data flow and harm analysis after RQ-COMM-001 selects candidates
- Exit evidence: data inventory, retention, consent/review determination, accessibility scope, abuse cases, and stop conditions
- Review trigger: real user data, vulnerable groups, or high-stakes content
RQ-COMM-005 — Pre-register the ROS comparison baseline
- Parent: repository pilot
- Children: none
- Maturity: Scoping
- Priority: P1; score 11/15
- Supporting evidence: PILOT-MEASUREMENT-communication-engineering
- Contradicting evidence: no comparable prior-project data
- Dependencies: RQ-COMM-001 scope freeze
- Related research: all first-slice work
- Produced artifacts: draft pilot measurement plan
- Engineering enabled: ROS continue/simplify/reject decision
- Confidence: Medium
- Largest uncertainty: credible counterfactual baseline
- Next action: freeze a lightweight non-ROS workflow before implementation
- Exit evidence: comparable inputs/outcomes, time accounting, and known confounders
- Review trigger: scope freeze
RQ-COMM-006 — Feasibility-test the procedural experiment
- Parent: RQ-COMM-001
- Children: RQ-COMM-007
- Maturity: Idea
- Priority: P1; score 10/15
- Supporting evidence: HY-COMM-2026-0001 and 0003
- Contradicting evidence: none
- Dependencies: RQ-COMM-001, 003, 004
- Related research: MS-COMM-2026-0001
- Produced artifacts: planned EX-COMM-2026-0001
- Engineering enabled: frozen experimental harness
- Confidence: Low before task selection
- Largest uncertainty: scoring reliability, effect sensitivity, and participant burden
- Next action: remain blocked from activation until dependencies exit
- Exit evidence: executable protocol, usable scoring, acceptable burden, no floor/ceiling effect
- Review trigger: task selection
RQ-COMM-007 — Estimate effects of controlled communication variants
- Parent: RQ-COMM-006
- Children: RQ-COMM-008, RQ-COMM-010
- Maturity: Idea
- Priority: P2; score 8/15
- Supporting evidence: none generated by this repository
- Contradicting evidence: none
- Dependencies: successful RQ-COMM-006 and analysis plan
- Related research: HY-COMM-2026-0002
- Produced artifacts: planned RP-COMM-2026-0003
- Engineering enabled: evidence-based document transformation
- Confidence: Low
- Largest uncertainty: causal separation of wording, structure, and visuals
- Next action: design only after feasibility
- Exit evidence: uncertainty intervals, failure analysis, subgroup limits, replication decision
- Review trigger: feasibility exit
RQ-COMM-008 — Build a functional communication taxonomy
- Parent: RQ-COMM-002, RQ-COMM-007
- Children: RQ-COMM-009
- Maturity: Idea
- Priority: P2; score 7/15
- Supporting evidence: TH-COMM-2026-0001 predicts function/context matter
- Contradicting evidence: no exhaustiveness evidence
- Dependencies: stable constructs and at least one empirical cycle
- Related research: genres, rhetoric, discourse, information design
- Produced artifacts: none
- Engineering enabled: strategy retrieval and comparison
- Confidence: Low
- Largest uncertainty: classification dimensions and boundary criteria
- Next action: collect candidate dimensions without claiming completeness
- Exit evidence: explicit inclusion rules, multi-label structure, inter-rater test, counterexamples
- Review trigger: completion of RQ-COMM-007
RQ-COMM-009 — Design an AI strategy-selection model
- Parent: RQ-COMM-008, RQ-COMM-010
- Children: none
- Maturity: Idea
- Priority: P3; score 5/15
- Supporting evidence: none
- Contradicting evidence: missing validated inputs/outcomes
- Dependencies: RQ-COMM-004, 008, 010
- Related research: AI instruction following, uncertainty calibration
- Produced artifacts: none
- Engineering enabled: adaptive communication system
- Confidence: Very Low
- Largest uncertainty: safe inference under missing audience/context data
- Next action: define misuse cases only; do not implement optimizer
- Exit evidence: validated input schema, abstention/fallback rules, offline evaluation, harm analysis
- Review trigger: supported taxonomy and cross-context findings
RQ-COMM-010 — Test generalization across audiences and contexts
- Parent: RQ-COMM-007
- Children: RQ-COMM-009
- Maturity: Idea
- Priority: P2; score 8/15
- Supporting evidence: TH-COMM-2026-0001 predicts moderation
- Contradicting evidence: none
- Dependencies: replicated within-context effect
- Related research: cross-cultural pragmatics, expertise reversal, accessibility
- Produced artifacts: none
- Engineering enabled: applicability boundaries and adaptive rules
- Confidence: Low
- Largest uncertainty: which moderators are decision-relevant
- Next action: preregister replication contexts after first effect
- Exit evidence: heterogeneous-effects model and failed-generalization cases
- Review trigger: replicated RQ-COMM-007 effect
RQ-COMM-011 — Explain documentation longevity and decay
- Parent: program objective
- Children: none
- Maturity: Idea
- Priority: P2; score 7/15
- Supporting evidence: none
- Contradicting evidence: none
- Dependencies: corpus access and longevity definition
- Related research: maintenance, information architecture, software evolution
- Produced artifacts: none
- Engineering enabled: durable documentation architecture and decay monitors
- Confidence: Very Low
- Largest uncertainty: survivorship bias and measurable usefulness over time
- Next action: scope longitudinal corpus and falsifiable longevity signals
- Exit evidence: sampling method, outcome definition, confounder model
- Review trigger: first pilot completes or a suitable corpus becomes available
RQ-COMM-012 — Define anti-manipulation boundaries
- Parent: RQ-COMM-004
- Children: RQ-COMM-009
- Maturity: Idea
- Priority: P1; score 10/15
- Supporting evidence: constitutional safety and ethical constraints
- Contradicting evidence: none
- Dependencies: representative persuasion/decision use cases
- Related research: dark patterns, informed consent, autonomy, rhetoric
- Produced artifacts: none
- Engineering enabled: optimization constraints and refusal rules
- Confidence: Low
- Largest uncertainty: operational distinction between ethical persuasion and manipulation across power asymmetries
- Next action: comparative normative and empirical scoping before any persuasion engineering
- Exit evidence: abuse cases, red lines, review thresholds, contested cases
- Review trigger: any persuasion or behavior-change project
Stage gates
| Transition | Minimum evidence |
|---|---|
| Idea → Scoping | decision relevance, owner candidate, explicit uncertainty |
| Scoping → Background Research | bounded question, inclusion criteria, evidence plan |
| Background Research → Deep Investigation | credible hypotheses and discriminating method |
| Deep Investigation → Validation | reusable result plus explicit falsification target |
| Validation → Synthesis | replication/triangulation and bounded applicability |
| Synthesis → Engineering Ready | accepted theory/decision, requirements, constraints, acceptance tests |
| Engineering Ready → Monitoring | implementation validated and telemetry/review triggers defined |
Items may move backward when assumptions fail, sources prove dependent, measures are invalid, or boundary conditions narrow materially.
Portfolio review cadence
- Review after every REP, failed experiment, material contradiction, or engineering decision.
- Review dormant P0/P1 items every 30 days while the portfolio is active.
- Review P2/P3 items quarterly or when dependencies change.
- Record deletions only as supersession or archival; never erase prior rationale.
Current portfolio decision
Continue MS-COMM-2026-0002 at Deep Investigation. Its desk-research phase selected an outcome vector, but task-specific validity remains blocked on RQ-COMM-001 candidate tasks. The highest-value next input is evidence from a named audience and comparison of three candidate tasks. Do not activate the participant experiment until RQ-COMM-001, 003, and 004 meet their exit evidence.